Full lawn installation on bare or stripped ground
This is the core job. Lay out the sequence: stripping or tilling, grading so water runs away from the foundation, soil work, laying in staggered rows, rolling, and the first soaking. Show one real yard before and after, and say how many days pass between signature and a green lawn.
